Tower Replacement

Candy Cooler
Chiller Conversion
Standby Power
Tower Replacement

Highlights of this chiller and tower replacement at a New Jersey Hospital included:
  • Complete re-design of the interior schematics
  • Create roof filtration system to eliminate dirt from emergency helicopters
  • Remove and replace a brick wall to extract the old chillers and install the new ones
Virtua - Roof Ductwork

Virtua - Carrier chillerTo increase cooling output and update old equipment, we replaced two 450-ton Carrier absorption chillers and both BAC towers at Virtua West Jersey Hospital Voorhees.

Removing the mechanical room extension wall was necessary for rigging the existing and new chillers.  We designed and sketched piping to fit the mechanical room. 

The absorption chillers were replaced with two larger capacity Carrier 550-ton centrifugal chillers.

While the chillers were being replaced, we also had to install a sump filtration system inVirtua - Pipes - Chiller each tower because emergency helicopter activity causes an unusually high amount of dirt around the towers’ air intake.  We used ten-inch steel pipe to replace the existing eight-inch piping between the towers, chillers and the building’s air handlers.

Using New Jersey sub-contractors for some of the work (including the excellent brick laying), we were able to get the two chillers and new piping installed, primed and ready for spring start up.

Once Carrier finishes with the warranty work on the two chillers, we will be responsible for the maintenance contract.